Geosynthetics

Technical Support & Installation

Design, welding crews and QA documentation. The part of a containment contract that decides whether the material on the drawings ends up performing on the ground.

Full-service provider

We would rather be responsible for the whole system

Supplying a roll of geomembrane is the easy half. The difficult half is the design of the lining system, the panel layout, the welding, the testing and the paperwork that proves it was done properly. Splitting those across two companies is how disputes start.

Our installation arm has been welding containment systems since the 1990s. We can supply material only, if that is what you want. But when we supply and install, there is one contract and one company answering for the result.

Cross-section of a geomembrane containment system showing prepared subgrade, geotextile cushion, liner, protection geotextile and drainage cover
Engineering

Technical support

What our engineers do before a roll is cut.

Technical consultation

Material selection against the exposure, the chemistry and the design life, with an honest note where the cheaper option carries real risk.

Lining system design

The full barrier build: primary liner, protection, drainage and any secondary containment, specified as one system rather than a parts list.

Layout plans

Panel layouts that minimise seam length, keep seams off the slope toe and give the crews a drawing they can actually work from.

Stability analysis

Interface friction and veneer stability checks on every slope, which is what decides smooth against textured sheet.

Installation advice

Subgrade preparation, anchor trench detailing, penetration and pipe boot design, and sequencing against the site programme.

In-situ monitoring

Planning and execution of monitoring during the works, so problems are found while the liner is still exposed.

On site

Trained welding specialists

Our welders are trained on our own equipment and retrained on a schedule, not once at induction. Seam quality is the single largest variable in whether a lining system holds, and it is the one most often left to whoever was available that week.

Every seam is tested. Non-destructive testing across the full length, destructive samples at set intervals, and both recorded panel by panel.

Installation

Where we install

The systems our crews are set up to build.

Landfill solutions

Basin lining, leachate collection, capping systems and gas venting, sequenced around an operating site.

Tunnel solutions

Waterproofing membranes, drainage layers and compartmentalised sealing for underground structures.

Hydraulic solutions

Canals, reservoirs, dams and process ponds, including work in and around existing water.

Civil solutions

Road and rail subgrade sealing, reinforced soil structures and working platforms.

Groundwater protection

Barrier systems and secondary containment for sites where the aquifer below is the thing being protected.

Concrete corrosion protection

Liner systems bonded to concrete structures exposed to aggressive chemistry or sewage.

Handover

What you get at completion

QA and QC record

Panel-by-panel seam testing records, trial weld logs and repair register as a single documented set.

Material certification

Certificates of analysis and batch references for every roll that went into the works.

As-built drawings

Final panel layout as installed, with seam numbering that matches the test records.

Warranty

Ten-year material warranty, with installation covered under the same contract.

Have a project that needs installing, not just supplying?

Send us the drawings and the programme. We will come back with a lining specification, an installation method statement and a price for both.

Scroll to Top